Good

Fremont County, Colorado · Just E of Steinmeier Ave · Structure no. FRCO 105-GRV B

Built
2024
1 years old
Condition
Good
inspected January 2025
Type
Box Beam or Girders - Single or Spread
Prestressed Concrete Continuous
Length
107 ft
2 main spans
Daily traffic
1,541
2022 count
Owner
County
County Highway Agency

About this bridge

Grandview Avenue over Four Mile Creek is a prestressed concrete continuous box beam or girders - single or spread carrying Grandview Avenue over Four Mile Creek in Fremont County, Colorado. It was built in 2024, so it is 1 years old, younger than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,541 vehicles a day, roughly 5% of them trucks, projected to reach 1,725 by 2042. The structure is 107 ft (32.5 m) long and 35 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesGrandview Avenue
CrossesFour Mile Creek
LocationJust E of Steinmeier Ave
RouteCounty Highway 0
Coordinates38.43943, -105.19143
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating52.9 US tons
Inventory rating40.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, precast panels
Main spans2
Design loadHL 93
Structure length107 ft (32.5 m)
Longest span49 ft (14.9 m)
Deck width35 ft (10.7 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,541 (2022)
Projected traffic1,725 by 2042
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Grandview Avenue over Four Mile Creek built?

It was built in 2024, making it 1 years old in 2025.

What condition is Grandview Avenue over Four Mile Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.

How much traffic does Grandview Avenue over Four Mile Creek carry?

About 1,541 vehicles per day (2022 count), of which roughly 5% are trucks.

How long is Grandview Avenue over Four Mile Creek?

The structure is 107 ft (32.5 m) long with a longest span of 49 ft (14.9 m) and a deck 35 ft wide.

Who owns Grandview Avenue over Four Mile Creek?

It is owned by the County Highway Agency.