I 25 Ml Nbnd over Sand Creek
GoodEl Paso County, Colorado · 1.1 MI NW El Paso Pueblo · Structure no. J-18-F
- Built
- 1929
- 96 years old, rebuilt 1941
- Condition
- Good
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 122 ft
- 4 main spans
- Daily traffic
- 17,500
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
I 25 Ml Nbnd over Sand Creek is a steel continuous stringer/multi-beam or girder carrying I 25 Ml Nbnd over Sand Creek in El Paso County, Colorado. It was built in 1929 and reconstructed in 1941, so it is 96 years old, older than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 17,500 vehicles a day, roughly 10% of them trucks, projected to reach 23,450 by 2040. The structure is 122 ft (37.2 m) long and 40 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I 25 Ml Nbnd over Sand Creek built?
It was built in 1929, making it 96 years old in 2025. It was reconstructed in 1941.
What condition is I 25 Ml Nbnd over Sand Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does I 25 Ml Nbnd over Sand Creek carry?
About 17,500 vehicles per day (2020 count), of which roughly 10% are trucks.
How long is I 25 Ml Nbnd over Sand Creek?
The structure is 122 ft (37.2 m) long with a longest span of 30 ft (9 m) and a deck 40 ft wide.
Who owns I 25 Ml Nbnd over Sand Creek?
It is owned by the State Highway Agency.