US Bridges

US 24 Bypass over East Fork Sand Creek

Good

El Paso County, Colorado · 1.2 Mi. S. of JCT US 24 M · Structure no. I-18-BE

Built
1994
31 years old
Condition
Good
inspected December 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
115 ft
1 main span
Daily traffic
60,000
2018 count
Owner
State
State Highway Agency

About this bridge

US 24 Bypass over East Fork Sand Creek is a prestressed concrete stringer/multi-beam or girder carrying US 24 Bypass over East Fork Sand Creek in El Paso County, Colorado. It was built in 1994, so it is 31 years old, younger than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 60,000 vehicles a day, roughly 7% of them trucks, projected to reach 80,000 by 2038. The structure is 115 ft (35.1 m) long and 125 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesUS 24 Bypass
CrossesEast Fork Sand Creek
Location1.2 Mi. S. of JCT US 24 M
RouteU.S. Route 24G
Coordinates38.822, -104.7262
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating87.9 US tons
Inventory rating34.6 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length115 ft (35.1 m)
Longest span112 ft (34.2 m)
Deck width125 ft (38.1 m)
Roadway width94 ft (28.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic60,000 (2018)
Projected traffic80,000 by 2038
Trucks7%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was US 24 Bypass over East Fork Sand Creek built?

It was built in 1994, making it 31 years old in 2025.

What condition is US 24 Bypass over East Fork Sand Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.

How much traffic does US 24 Bypass over East Fork Sand Creek carry?

About 60,000 vehicles per day (2018 count), of which roughly 7% are trucks.

How long is US 24 Bypass over East Fork Sand Creek?

The structure is 115 ft (35.1 m) long with a longest span of 112 ft (34.2 m) and a deck 125 ft wide.

Who owns US 24 Bypass over East Fork Sand Creek?

It is owned by the State Highway Agency.