US Bridges

US 24 Ml Wbnd over El Paso Blv Fountain Crk

Fair

El Paso County, Colorado · In Manitou Springs · Structure no. I-17-GF

Built
1969
56 years old
Condition
Fair
inspected December 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
205 ft
2 main spans
Daily traffic
13,500
2020 count
Owner
State
State Highway Agency

About this bridge

US 24 Ml Wbnd over El Paso Blv Fountain Crk is a prestressed concrete stringer/multi-beam or girder carrying US 24 Ml Wbnd over El Paso Blv Fountain Crk in El Paso County, Colorado. It was built in 1969, so it is 56 years old, older than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 13,500 vehicles a day, roughly 4% of them trucks, projected to reach 16,200 by 2040. The structure is 205 ft (62.5 m) long and 45 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesUS 24 Ml Wbnd
CrossesEl Paso Blv Fountain Crk
LocationIn Manitou Springs
RouteU.S. Route 24A
Coordinates38.85924, -104.89777
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating64.9 US tons
Inventory rating32.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length205 ft (62.5 m)
Longest span99 ft (30.2 m)
Deck width45 ft (13.6 m)
Roadway width41 ft (12.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic13,500 (2020)
Projected traffic16,200 by 2040
Trucks4%
Lanes on structure3
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway and waterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was US 24 Ml Wbnd over El Paso Blv Fountain Crk built?

It was built in 1969, making it 56 years old in 2025.

What condition is US 24 Ml Wbnd over El Paso Blv Fountain Crk in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.

How much traffic does US 24 Ml Wbnd over El Paso Blv Fountain Crk carry?

About 13,500 vehicles per day (2020 count), of which roughly 4% are trucks.

How long is US 24 Ml Wbnd over El Paso Blv Fountain Crk?

The structure is 205 ft (62.5 m) long with a longest span of 99 ft (30.2 m) and a deck 45 ft wide.

Who owns US 24 Ml Wbnd over El Paso Blv Fountain Crk?

It is owned by the State Highway Agency.