Ramp to SB I25 over Dirty Woman Creek R
GoodEl Paso County, Colorado · Just South of SH 105 · Structure no. H-17-BB
- Built
- 2004
- 21 years old
- Condition
- Good
- inspected February 2025
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 324 ft
- 3 main spans
- Daily traffic
- 84,000
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
Ramp to SB I25 over Dirty Woman Creek R is a steel continuous stringer/multi-beam or girder carrying Ramp to SB I25 over Dirty Woman Creek R in El Paso County, Colorado. It was built in 2004, so it is 21 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 84,000 vehicles a day, roughly 9% of them trucks, projected to reach 121,800 by 2040. The structure is 324 ft (98.8 m) long and 76 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ramp to SB I25 over Dirty Woman Creek R built?
It was built in 2004, making it 21 years old in 2025.
What condition is Ramp to SB I25 over Dirty Woman Creek R in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2025.
How much traffic does Ramp to SB I25 over Dirty Woman Creek R carry?
About 84,000 vehicles per day (2020 count), of which roughly 9% are trucks.
How long is Ramp to SB I25 over Dirty Woman Creek R?
The structure is 324 ft (98.8 m) long with a longest span of 131 ft (40 m) and a deck 76 ft wide.
Who owns Ramp to SB I25 over Dirty Woman Creek R?
It is owned by the State Highway Agency.