US Bridges

Old Pueblo Road over Fountain Creek

Good

El Paso County, Colorado · 0.2 MI S of Hanover Road · Structure no. EPC0415-01.20A

Built
1989
36 years old
Condition
Good
inspected February 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
285 ft
2 main spans
Daily traffic
905
2020 count
Owner
County
County Highway Agency

About this bridge

Old Pueblo Road over Fountain Creek is a prestressed concrete continuous stringer/multi-beam or girder carrying Old Pueblo Road over Fountain Creek in El Paso County, Colorado. It was built in 1989, so it is 36 years old, younger than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 905 vehicles a day, roughly 9% of them trucks, projected to reach 1,186 by 2040. The structure is 285 ft (87 m) long and 39 ft wide. If it were closed, the detour would be 11.8 mi (19 km).

CarriesOld Pueblo Road
CrossesFountain Creek
Location0.2 MI S of Hanover Road
RouteCounty Highway 0
Coordinates38.60167, -104.67
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating58.8 US tons
Inventory rating35.2 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length285 ft (87 m)
Longest span138 ft (42.2 m)
Deck width39 ft (11.8 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic905 (2020)
Projected traffic1,186 by 2040
Trucks9%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed11.8 mi (19 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Old Pueblo Road over Fountain Creek built?

It was built in 1989, making it 36 years old in 2025.

What condition is Old Pueblo Road over Fountain Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does Old Pueblo Road over Fountain Creek carry?

About 905 vehicles per day (2020 count), of which roughly 9% are trucks.

How long is Old Pueblo Road over Fountain Creek?

The structure is 285 ft (87 m) long with a longest span of 138 ft (42.2 m) and a deck 39 ft wide.

Who owns Old Pueblo Road over Fountain Creek?

It is owned by the County Highway Agency.