US Bridges

Vollmer Road over West Kiowa Creek

Fair

El Paso County, Colorado · .6 MI N of Swan Rd. · Structure no. EPC0401-07.30A

Built
1983
42 years old
Condition
Fair
inspected January 2024
Type
Culvert
Concrete
Length
45 ft
3 main spans
Daily traffic
1,668
2021 count
Owner
County
County Highway Agency

About this bridge

Vollmer Road over West Kiowa Creek is a concrete culvert carrying Vollmer Road over West Kiowa Creek in El Paso County, Colorado. It was built in 1983, so it is 42 years old, younger than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,668 vehicles a day, roughly 9% of them trucks, projected to reach 2,185 by 2041. The structure is 45 ft (13.7 m) long and 40 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesVollmer Road
CrossesWest Kiowa Creek
Location.6 MI N of Swan Rd.
RouteCounty Highway 0
Coordinates39.0375, -104.66333
Functional classRural Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating40 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadUnknown
Structure length45 ft (13.7 m)
Longest span17 ft (5.3 m)
Deck width40 ft (12.2 m)
Roadway width37 ft (11.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,668 (2021)
Projected traffic2,185 by 2041
Trucks9%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$13,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Vollmer Road over West Kiowa Creek built?

It was built in 1983, making it 42 years old in 2025.

What condition is Vollmer Road over West Kiowa Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.

How much traffic does Vollmer Road over West Kiowa Creek carry?

About 1,668 vehicles per day (2021 count), of which roughly 9% are trucks.

How long is Vollmer Road over West Kiowa Creek?

The structure is 45 ft (13.7 m) long with a longest span of 17 ft (5.3 m) and a deck 40 ft wide.

Who owns Vollmer Road over West Kiowa Creek?

It is owned by the County Highway Agency.