US Bridges

Falcon Highway over Branch Squirrel Creek

Fair

El Paso County, Colorado · 0.1 MI E of Abilene Drive · Structure no. EPC0132-01.90A

Built
1995
30 years old
Condition
Fair
inspected April 2024
Type
Culvert
Concrete
Length
62 ft
3 main spans
Daily traffic
2,048
2021 count
Owner
County
County Highway Agency

About this bridge

Falcon Highway over Branch Squirrel Creek is a concrete culvert carrying Falcon Highway over Branch Squirrel Creek in El Paso County, Colorado. It was built in 1995, so it is 30 years old, younger than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 2,048 vehicles a day, roughly 4% of them trucks, projected to reach 2,683 by 2041. The structure is 62 ft (18.8 m) long and 39 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesFalcon Highway
CrossesBranch Squirrel Creek
Location0.1 MI E of Abilene Drive
RouteCounty Highway 0
Coordinates38.92555, -104.58305
Functional classRural Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating80.8 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length62 ft (18.8 m)
Longest span20 ft (6.1 m)
Deck width39 ft (11.8 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,048 (2021)
Projected traffic2,683 by 2041
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Falcon Highway over Branch Squirrel Creek built?

It was built in 1995, making it 30 years old in 2025.

What condition is Falcon Highway over Branch Squirrel Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.

How much traffic does Falcon Highway over Branch Squirrel Creek carry?

About 2,048 vehicles per day (2021 count), of which roughly 4% are trucks.

How long is Falcon Highway over Branch Squirrel Creek?

The structure is 62 ft (18.8 m) long with a longest span of 20 ft (6.1 m) and a deck 39 ft wide.

Who owns Falcon Highway over Branch Squirrel Creek?

It is owned by the County Highway Agency.