Elbert Road over Black Squirrel Creek
FairEl Paso County, Colorado · 1.5 MI N Judge Orr Road · Structure no. EPC0091-01.50
- Built
- 1934
- 91 years old
- Condition
- Fair
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 40 ft
- 2 main spans
- Daily traffic
- 1,273
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
Elbert Road over Black Squirrel Creek is a steel continuous stringer/multi-beam or girder carrying Elbert Road over Black Squirrel Creek in El Paso County, Colorado. It was built in 1934, so it is 91 years old, older than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,273 vehicles a day, roughly 9% of them trucks, projected to reach 1,668 by 2040. The structure is 40 ft (12.2 m) long and 30 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Elbert Road over Black Squirrel Creek built?
It was built in 1934, making it 91 years old in 2025.
What condition is Elbert Road over Black Squirrel Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does Elbert Road over Black Squirrel Creek carry?
About 1,273 vehicles per day (2020 count), of which roughly 9% are trucks.
How long is Elbert Road over Black Squirrel Creek?
The structure is 40 ft (12.2 m) long with a longest span of 19 ft (5.9 m) and a deck 30 ft wide.
Who owns Elbert Road over Black Squirrel Creek?
It is owned by the County Highway Agency.