Dublin Blvd over Sand Creek
FairEl Paso County, Colorado · 0.2 MI W of Peterson RD · Structure no. CSG-N.00-14.95
- Built
- 2008
- 17 years old
- Condition
- Fair
- inspected April 2024
- Type
- Frame
- Concrete
- Length
- 52 ft
- 2 main spans
- Daily traffic
- 11,425
- 2021 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Dublin Blvd over Sand Creek is a concrete frame carrying Dublin Blvd over Sand Creek in El Paso County, Colorado. It was built in 2008, so it is 17 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 11,425 vehicles a day, roughly 4% of them trucks, projected to reach 14,967 by 2041. The structure is 52 ft (15.9 m) long and 156 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Dublin Blvd over Sand Creek built?
It was built in 2008, making it 17 years old in 2025.
What condition is Dublin Blvd over Sand Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does Dublin Blvd over Sand Creek carry?
About 11,425 vehicles per day (2021 count), of which roughly 4% are trucks.
How long is Dublin Blvd over Sand Creek?
The structure is 52 ft (15.9 m) long with a longest span of 24 ft (7.3 m) and a deck 156 ft wide.
Who owns Dublin Blvd over Sand Creek?
It is owned by the City or Municipal Highway Agency.