US Bridges

Palmer Park Blvd over West Fork Sand Creek

Good

El Paso County, Colorado · 0.25 MI E of Academy Blvd · Structure no. CSG-K.26-10.08A

Built
1999
26 years old
Condition
Good
inspected March 2024
Type
Tee Beam
Prestressed Concrete
Length
63 ft
1 main span
Daily traffic
9,784
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

Palmer Park Blvd over West Fork Sand Creek is a prestressed concrete tee beam carrying Palmer Park Blvd over West Fork Sand Creek in El Paso County, Colorado. It was built in 1999, so it is 26 years old, younger than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 9,784 vehicles a day, roughly 4% of them trucks, projected to reach 12,818 by 2041. The structure is 63 ft (19.1 m) long and 81 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesPalmer Park Blvd
CrossesWest Fork Sand Creek
Location0.25 MI E of Academy Blvd
RouteCity Street 0
Coordinates38.85444, -104.75194
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating40 US tons
Inventory rating36 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckOther
Main spans1
Design loadHS 20
Structure length63 ft (19.1 m)
Longest span57 ft (17.5 m)
Deck width81 ft (24.6 m)
Roadway width65 ft (19.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic9,784 (2021)
Projected traffic12,818 by 2041
Trucks4%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Palmer Park Blvd over West Fork Sand Creek built?

It was built in 1999, making it 26 years old in 2025.

What condition is Palmer Park Blvd over West Fork Sand Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does Palmer Park Blvd over West Fork Sand Creek carry?

About 9,784 vehicles per day (2021 count), of which roughly 4% are trucks.

How long is Palmer Park Blvd over West Fork Sand Creek?

The structure is 63 ft (19.1 m) long with a longest span of 57 ft (17.5 m) and a deck 81 ft wide.

Who owns Palmer Park Blvd over West Fork Sand Creek?

It is owned by the City or Municipal Highway Agency.