US Bridges

Ramp EB Proby Pkwy over Ramp to SB Academy

Good

El Paso County, Colorado · Colorado Springs · Structure no. CSG-K.21-04.92

Built
2012
13 years old
Condition
Good
inspected March 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
114 ft
1 main span
Daily traffic
866
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

Ramp EB Proby Pkwy over Ramp to SB Academy is a prestressed concrete stringer/multi-beam or girder carrying Ramp EB Proby Pkwy over Ramp to SB Academy in El Paso County, Colorado. It was built in 2012, so it is 13 years old, younger than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 866 vehicles a day, projected to reach 1,134 by 2041. The structure is 114 ft (34.7 m) long and 38 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesRamp EB Proby Pkwy
CrossesRamp to SB Academy
LocationColorado Springs
RouteCity Street 0
Coordinates38.78109, -104.75529
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating68.5 US tons
Inventory rating41 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length114 ft (34.7 m)
Longest span108 ft (32.9 m)
Deck width38 ft (11.6 m)
Roadway width35 ft (10.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic866 (2021)
Projected traffic1,134 by 2041
Trucks0%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Ramp EB Proby Pkwy over Ramp to SB Academy built?

It was built in 2012, making it 13 years old in 2025.

What condition is Ramp EB Proby Pkwy over Ramp to SB Academy in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does Ramp EB Proby Pkwy over Ramp to SB Academy carry?

About 866 vehicles per day (2021 count).

How long is Ramp EB Proby Pkwy over Ramp to SB Academy?

The structure is 114 ft (34.7 m) long with a longest span of 108 ft (32.9 m) and a deck 38 ft wide.

Who owns Ramp EB Proby Pkwy over Ramp to SB Academy?

It is owned by the City or Municipal Highway Agency.