US Bridges

Hunters Lane over Spring Run

Good

El Paso County, Colorado · Just S of Broadmoor Ave · Structure no. CSG-F.40-05.59

Built
2023
2 years old
Condition
Good
inspected April 2024
Type
Culvert
Concrete
Length
23 ft
2 main spans
Daily traffic
—
Owner
City
City or Municipal Highway Agency

About this bridge

Hunters Lane over Spring Run is a concrete culvert carrying Hunters Lane over Spring Run in El Paso County, Colorado. It was built in 2023, so it is 2 years old, younger than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

No traffic count is recorded. The structure is 23 ft (7 m) long and 21 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesHunters Lane
CrossesSpring Run
LocationJust S of Broadmoor Ave
RouteCity Street 0
Coordinates38.78991, -104.84258
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert9 ExcellentNo problems noted.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating89.3 US tons
Inventory rating67.9 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHL 93
Structure length23 ft (7 m)
Longest span11 ft (3.4 m)
Deck width21 ft (6.4 m)
Roadway width19 ft (5.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic—
Projected traffic—
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Hunters Lane over Spring Run built?

It was built in 2023, making it 2 years old in 2025.

What condition is Hunters Lane over Spring Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does Hunters Lane over Spring Run carry?

No traffic count is recorded for this structure.

How long is Hunters Lane over Spring Run?

The structure is 23 ft (7 m) long with a longest span of 11 ft (3.4 m) and a deck 21 ft wide.

Who owns Hunters Lane over Spring Run?

It is owned by the City or Municipal Highway Agency.