US Bridges

Rendezvous Trail over Douglas Creek

FairPosted for load

El Paso County, Colorado · East of Centennial Blvd · Structure no. CSG-E.28-14.70

Built
1984
41 years old
Condition
Fair
inspected April 2024
Type
Culvert
Concrete
Length
31 ft
2 main spans
Daily traffic
241
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

Rendezvous Trail over Douglas Creek is a concrete culvert carrying Rendezvous Trail over Douglas Creek in El Paso County, Colorado. It was built in 1984, so it is 41 years old, younger than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 241 vehicles a day, projected to reach 315 by 2041. The structure is 31 ft (9.3 m) long and 53 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesRendezvous Trail
CrossesDouglas Creek
LocationEast of Centennial Blvd
RouteCity Street 0
Coordinates38.921, -104.86295
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating35.4 US tons
Inventory rating21.2 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHS 20
Structure length31 ft (9.3 m)
Longest span15 ft (4.5 m)
Deck width53 ft (16.3 m)
Roadway width35 ft (10.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic241 (2021)
Projected traffic315 by 2041
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Rendezvous Trail over Douglas Creek built?

It was built in 1984, making it 41 years old in 2025.

What condition is Rendezvous Trail over Douglas Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.

How much traffic does Rendezvous Trail over Douglas Creek carry?

About 241 vehicles per day (2021 count).

How long is Rendezvous Trail over Douglas Creek?

The structure is 31 ft (9.3 m) long with a longest span of 15 ft (4.5 m) and a deck 53 ft wide.

Who owns Rendezvous Trail over Douglas Creek?

It is owned by the City or Municipal Highway Agency.