US Bridges

Route 5 over Drainage Channel

GoodPosted for load

El Paso County, Colorado · 50 Ft N of Junc W/ RTE 4 · Structure no. 000000000P85119

Built
1984
41 years old
Condition
Good
inspected August 2023
Type
Culvert
Concrete
Length
20 ft
1 main span
Daily traffic
100
2017 count
Owner
Federal
Army

About this bridge

Route 5 over Drainage Channel is a concrete culvert carrying Route 5 over Drainage Channel in El Paso County, Colorado. It was built in 1984, so it is 41 years old, younger than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.

It carries about 100 vehicles a day, roughly 10% of them trucks, projected to reach 200 by 2044. The structure is 20 ft (6.2 m) long and 67 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesRoute 5
CrossesDrainage Channel
Location50 Ft N of Junc W/ RTE 4
Coordinates38.6649, -104.7746
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating32 US tons
Inventory rating24.8 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadUnknown
Structure length20 ft (6.2 m)
Longest span20 ft (6.2 m)
Deck width67 ft (20.4 m)
Roadway width64 ft (19.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2017)
Projected traffic200 by 2044
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerArmy
Maintained byArmy
Historic statusHistorical significance not determinable at this time
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$2,000 (2023 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Route 5 over Drainage Channel built?

It was built in 1984, making it 41 years old in 2025.

What condition is Route 5 over Drainage Channel in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does Route 5 over Drainage Channel carry?

About 100 vehicles per day (2017 count), of which roughly 10% are trucks.

How long is Route 5 over Drainage Channel?

The structure is 20 ft (6.2 m) long with a longest span of 20 ft (6.2 m) and a deck 67 ft wide.

Who owns Route 5 over Drainage Channel?

It is owned by the Army.