Streamside Road over Gore Creek
FairEagle County, Colorado · 0.01 MI S of I-70 W Entra · Structure no. VAIL-STRMSIDE-A
- Built
- 1997
- 28 years old
- Condition
- Fair
- inspected June 2024
- Type
- Slab
- Concrete
- Length
- 37 ft
- 1 main span
- Daily traffic
- 1,230
- 2021 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
Streamside Road over Gore Creek is a concrete slab carrying Streamside Road over Gore Creek in Eagle County, Colorado. It was built in 1997, so it is 28 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,230 vehicles a day, roughly 4% of them trucks, projected to reach 1,525 by 2041. The structure is 37 ft (11.3 m) long and 84 ft wide. If it were closed, the detour would be 98.8 mi (159 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Streamside Road over Gore Creek built?
It was built in 1997, making it 28 years old in 2025.
What condition is Streamside Road over Gore Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.
How much traffic does Streamside Road over Gore Creek carry?
About 1,230 vehicles per day (2021 count), of which roughly 4% are trucks.
How long is Streamside Road over Gore Creek?
The structure is 37 ft (11.3 m) long with a longest span of 33 ft (10.1 m) and a deck 84 ft wide.
Who owns Streamside Road over Gore Creek?
It is owned by the Town or Township Highway Agency.