I 70 (edwards Spur over UP RR
GoodEagle County, Colorado · At Edwards · Structure no. F-10-I
- Built
- 1970
- 55 years old, rebuilt 2020
- Condition
- Good
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 141 ft
- 3 main spans
- Daily traffic
- 15,000
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
I 70 (edwards Spur over UP RR is a steel continuous stringer/multi-beam or girder carrying I 70 (edwards Spur over UP RR in Eagle County, Colorado. It was built in 1970 and reconstructed in 2020, so it is 55 years old, older than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 15,000 vehicles a day, roughly 4% of them trucks, projected to reach 18,300 by 2040. The structure is 141 ft (42.9 m) long and 60 ft wide. If it were closed, the detour would be 8.7 mi (14 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I 70 (edwards Spur over UP RR built?
It was built in 1970, making it 55 years old in 2025. It was reconstructed in 2020.
What condition is I 70 (edwards Spur over UP RR in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.
How much traffic does I 70 (edwards Spur over UP RR carry?
About 15,000 vehicles per day (2020 count), of which roughly 4% are trucks.
How long is I 70 (edwards Spur over UP RR?
The structure is 141 ft (42.9 m) long with a longest span of 59 ft (18.1 m) and a deck 60 ft wide.
Who owns I 70 (edwards Spur over UP RR?
It is owned by the State Highway Agency.