Chambers Road NB over Newlin Gulch | Newlin Gu
GoodDouglas County, Colorado · 1.1 MI N of Hess Road · Structure no. PAR CHMBR-4.0NB
- Built
- 2017
- 8 years old
- Condition
- Good
- inspected February 2025
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 142 ft
- 1 main span
- Daily traffic
- 8,373
- 2022 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
Chambers Road NB over Newlin Gulch | Newlin Gu is a prestressed concrete stringer/multi-beam or girder carrying Chambers Road NB over Newlin Gulch | Newlin Gu in Douglas County, Colorado. It was built in 2017, so it is 8 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 8,373 vehicles a day, roughly 2% of them trucks, projected to reach 11,220 by 2042. The structure is 142 ft (43.4 m) long and 70 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Chambers Road NB over Newlin Gulch | Newlin Gu built?
It was built in 2017, making it 8 years old in 2025.
What condition is Chambers Road NB over Newlin Gulch | Newlin Gu in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2025.
How much traffic does Chambers Road NB over Newlin Gulch | Newlin Gu carry?
About 8,373 vehicles per day (2022 count), of which roughly 2% are trucks.
How long is Chambers Road NB over Newlin Gulch | Newlin Gu?
The structure is 142 ft (43.4 m) long with a longest span of 139 ft (42.4 m) and a deck 70 ft wide.
Who owns Chambers Road NB over Newlin Gulch | Newlin Gu?
It is owned by the Town or Township Highway Agency.