Belford Avenue over Happy Canyon Creek | Ped
GoodDouglas County, Colorado · 1.5 MI E of S Peoria ST · Structure no. PAR BELFORD-0.1
- Built
- 2021
- 4 years old
- Condition
- Good
- inspected February 2025
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 157 ft
- 2 main spans
- Daily traffic
- 100
- 2023 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Belford Avenue over Happy Canyon Creek | Ped is a prestressed concrete stringer/multi-beam or girder carrying Belford Avenue over Happy Canyon Creek | Ped in Douglas County, Colorado. It was built in 2021, so it is 4 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: new structure not yet open to traffic.
It carries about 100 vehicles a day, projected to reach 100 by 2043. The structure is 157 ft (48 m) long and 94 ft wide. If it were closed, the detour would be 98.8 mi (159 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Belford Avenue over Happy Canyon Creek | Ped built?
It was built in 2021, making it 4 years old in 2025.
What condition is Belford Avenue over Happy Canyon Creek | Ped in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2025.
How much traffic does Belford Avenue over Happy Canyon Creek | Ped carry?
About 100 vehicles per day (2023 count).
How long is Belford Avenue over Happy Canyon Creek | Ped?
The structure is 157 ft (48 m) long with a longest span of 74 ft (22.5 m) and a deck 94 ft wide.
Who owns Belford Avenue over Happy Canyon Creek | Ped?
It is owned by the City or Municipal Highway Agency.