US Bridges

SH 470 Ml over Highline Canal

Good

Douglas County, Colorado · .5 M E of JCT US 85 · Structure no. F-16-KP

Built
1984
41 years old
Condition
Good
inspected January 2023
Type
Culvert
Concrete
Length
29 ft
1 main span
Daily traffic
81,000
2020 count
Owner
State
State Highway Agency

About this bridge

SH 470 Ml over Highline Canal is a concrete culvert carrying SH 470 Ml over Highline Canal in Douglas County, Colorado. It was built in 1984, so it is 41 years old, younger than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 81,000 vehicles a day, roughly 2% of them trucks, projected to reach 106,920 by 2040. The structure is 29 ft (8.8 m) long and 252 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesSH 470 Ml
CrossesHighline Canal
Location.5 M E of JCT US 85
RouteState Highway 470A
Coordinates39.56356, -105.02254
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionJanuary 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating89.3 US tons
Inventory rating67.9 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHS 20
Structure length29 ft (8.8 m)
Longest span29 ft (8.8 m)
Deck width252 ft (76.8 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic81,000 (2020)
Projected traffic106,920 by 2040
Trucks2%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$395,000
NavigationNo navigation control on waterway

Frequently asked questions

When was SH 470 Ml over Highline Canal built?

It was built in 1984, making it 41 years old in 2025.

What condition is SH 470 Ml over Highline Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2023.

How much traffic does SH 470 Ml over Highline Canal carry?

About 81,000 vehicles per day (2020 count), of which roughly 2% are trucks.

How long is SH 470 Ml over Highline Canal?

The structure is 29 ft (8.8 m) long with a longest span of 29 ft (8.8 m) and a deck 252 ft wide.

Who owns SH 470 Ml over Highline Canal?

It is owned by the State Highway Agency.