US Bridges

Titan Parkway over SH 85 Ml

Good

Douglas County, Colorado · In Douglas County · Structure no. F-16-JB

Built
2003
22 years old
Condition
Good
inspected February 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
215 ft
2 main spans
Daily traffic
13,281
2024 count
Owner
State
State Highway Agency

About this bridge

Titan Parkway over SH 85 Ml is a prestressed concrete continuous stringer/multi-beam or girder carrying Titan Parkway over SH 85 Ml in Douglas County, Colorado. It was built in 2003, so it is 22 years old, younger than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 13,281 vehicles a day, roughly 8% of them trucks, projected to reach 17,797 by 2044. The structure is 215 ft (65.4 m) long and 59 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesTitan Parkway
CrossesSH 85 Ml
LocationIn Douglas County
RouteCounty Highway 0
Coordinates39.50979, -105.01739
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating55 US tons
Inventory rating40 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, precast panels
Main spans2
Design loadHS 25 or greater
Structure length215 ft (65.4 m)
Longest span105 ft (32 m)
Deck width59 ft (18 m)
Roadway width56 ft (17.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic13,281 (2024)
Projected traffic17,797 by 2044
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Titan Parkway over SH 85 Ml built?

It was built in 2003, making it 22 years old in 2025.

What condition is Titan Parkway over SH 85 Ml in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does Titan Parkway over SH 85 Ml carry?

About 13,281 vehicles per day (2024 count), of which roughly 8% are trucks.

How long is Titan Parkway over SH 85 Ml?

The structure is 215 ft (65.4 m) long with a longest span of 105 ft (32 m) and a deck 59 ft wide.

Who owns Titan Parkway over SH 85 Ml?

It is owned by the State Highway Agency.