CO Road 105 | S Pe over Oakland School Gulch
FairDouglas County, Colorado · 0.1 MI S Wolfensberger RD · Structure no. DOU105-23.50A
- Built
- 1990
- 35 years old
- Condition
- Fair
- inspected February 2025
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 103 ft
- 1 main span
- Daily traffic
- 4,343
- 2021 count
- Owner
- County
- County Highway Agency
About this bridge
CO Road 105 | S Pe over Oakland School Gulch is a prestressed concrete stringer/multi-beam or girder carrying CO Road 105 | S Pe over Oakland School Gulch in Douglas County, Colorado. It was built in 1990, so it is 35 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 4,343 vehicles a day, roughly 9% of them trucks, projected to reach 5,819 by 2041. The structure is 103 ft (31.5 m) long and 39 ft wide. If it were closed, the detour would be 8.7 mi (14 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CO Road 105 | S Pe over Oakland School Gulch built?
It was built in 1990, making it 35 years old in 2025.
What condition is CO Road 105 | S Pe over Oakland School Gulch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2025.
How much traffic does CO Road 105 | S Pe over Oakland School Gulch carry?
About 4,343 vehicles per day (2021 count), of which roughly 9% are trucks.
How long is CO Road 105 | S Pe over Oakland School Gulch?
The structure is 103 ft (31.5 m) long with a longest span of 97 ft (29.7 m) and a deck 39 ft wide.
Who owns CO Road 105 | S Pe over Oakland School Gulch?
It is owned by the County Highway Agency.