CO RD 105 | Perry over East Plum Creek
GoodDouglas County, Colorado · 0.75 Mile N of Noe RD · Structure no. DOU105-04.70A
- Built
- 2008
- 17 years old
- Condition
- Good
- inspected February 2025
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 180 ft
- 2 main spans
- Daily traffic
- 2,011
- 2021 count
- Owner
- County
- County Highway Agency
About this bridge
CO RD 105 | Perry over East Plum Creek is a prestressed concrete continuous stringer/multi-beam or girder carrying CO RD 105 | Perry over East Plum Creek in Douglas County, Colorado. It was built in 2008, so it is 17 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,011 vehicles a day, roughly 4% of them trucks, projected to reach 2,695 by 2041. The structure is 180 ft (54.9 m) long and 43 ft wide. If it were closed, the detour would be 11.8 mi (19 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CO RD 105 | Perry over East Plum Creek built?
It was built in 2008, making it 17 years old in 2025.
What condition is CO RD 105 | Perry over East Plum Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2025.
How much traffic does CO RD 105 | Perry over East Plum Creek carry?
About 2,011 vehicles per day (2021 count), of which roughly 4% are trucks.
How long is CO RD 105 | Perry over East Plum Creek?
The structure is 180 ft (54.9 m) long with a longest span of 84 ft (25.6 m) and a deck 43 ft wide.
Who owns CO RD 105 | Perry over East Plum Creek?
It is owned by the County Highway Agency.