US Bridges

CO Road 80 | Jones over West Cherry Creek

Good

Douglas County, Colorado · .3 MI West of SH83 · Structure no. DOU080-06.05A

Built
1992
33 years old
Condition
Good
inspected February 2025
Type
Slab
Concrete Continuous
Length
114 ft
3 main spans
Daily traffic
69
2021 count
Owner
County
County Highway Agency

About this bridge

CO Road 80 | Jones over West Cherry Creek is a concrete continuous slab carrying CO Road 80 | Jones over West Cherry Creek in Douglas County, Colorado. It was built in 1992, so it is 33 years old, younger than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 69 vehicles a day, projected to reach 92 by 2041. The structure is 114 ft (34.8 m) long and 29 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesCO Road 80 | Jones
CrossesWest Cherry Creek
Location.3 MI West of SH83
RouteCounty Highway 0
Coordinates39.17322, -104.7467
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionFebruary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating98.8 US tons
Inventory rating59.3 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length114 ft (34.8 m)
Longest span37 ft (11.2 m)
Deck width29 ft (8.7 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic69 (2021)
Projected traffic92 by 2041
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was CO Road 80 | Jones over West Cherry Creek built?

It was built in 1992, making it 33 years old in 2025.

What condition is CO Road 80 | Jones over West Cherry Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2025.

How much traffic does CO Road 80 | Jones over West Cherry Creek carry?

About 69 vehicles per day (2021 count).

How long is CO Road 80 | Jones over West Cherry Creek?

The structure is 114 ft (34.8 m) long with a longest span of 37 ft (11.2 m) and a deck 29 ft wide.

Who owns CO Road 80 | Jones over West Cherry Creek?

It is owned by the County Highway Agency.