Canyonside Bouleva over Newlin Gulch
GoodDouglas County, Colorado · 0.5 N of Happy Canyon RD · Structure no. CASTLEPINES-5
- Built
- 2024
- 1 years old
- Condition
- Good
- inspected March 2025
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 55 ft
- 1 main span
- Daily traffic
- 100
- 2021 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Canyonside Bouleva over Newlin Gulch is a prestressed concrete stringer/multi-beam or girder carrying Canyonside Bouleva over Newlin Gulch in Douglas County, Colorado. It was built in 2024, so it is 1 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 100 vehicles a day, projected to reach 170 by 2041. The structure is 55 ft (16.8 m) long and 43 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Canyonside Bouleva over Newlin Gulch built?
It was built in 2024, making it 1 years old in 2025.
What condition is Canyonside Bouleva over Newlin Gulch in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2025.
How much traffic does Canyonside Bouleva over Newlin Gulch carry?
About 100 vehicles per day (2021 count).
How long is Canyonside Bouleva over Newlin Gulch?
The structure is 55 ft (16.8 m) long with a longest span of 50 ft (15.2 m) and a deck 43 ft wide.
Who owns Canyonside Bouleva over Newlin Gulch?
It is owned by the City or Municipal Highway Agency.