Timber Mill Parkwa over East Plum Creek
GoodDouglas County, Colorado · 0.6 MI SE of US 85 · Structure no. CAS TMBRMIL-0.2
- Built
- 2022
- 3 years old
- Condition
- Good
- inspected February 2025
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 550 ft
- 4 main spans
- Daily traffic
- —
- 2022 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
Timber Mill Parkwa over East Plum Creek is a prestressed concrete continuous stringer/multi-beam or girder carrying Timber Mill Parkwa over East Plum Creek in Douglas County, Colorado. It was built in 2022, so it is 3 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
No traffic count is recorded. The structure is 550 ft (167.6 m) long and 62 ft wide. If it were closed, the detour would be 98.8 mi (159 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Timber Mill Parkwa over East Plum Creek built?
It was built in 2022, making it 3 years old in 2025.
What condition is Timber Mill Parkwa over East Plum Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2025.
How much traffic does Timber Mill Parkwa over East Plum Creek carry?
No traffic count is recorded for this structure.
How long is Timber Mill Parkwa over East Plum Creek?
The structure is 550 ft (167.6 m) long with a longest span of 145 ft (44.3 m) and a deck 62 ft wide.
Who owns Timber Mill Parkwa over East Plum Creek?
It is owned by the Town or Township Highway Agency.