US Bridges

NB I-25 Ramp over I225 Ml

Good

Denver County, Colorado · At I-25/I-225 · Structure no. F-17-FJ

Built
2005
20 years old
Condition
Good
inspected March 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
476 ft
3 main spans
Daily traffic
111,500
2020 count
Owner
State
State Highway Agency

About this bridge

NB I-25 Ramp over I225 Ml is a prestressed concrete continuous stringer/multi-beam or girder carrying NB I-25 Ramp over I225 Ml in Denver County, Colorado. It was built in 2005, so it is 20 years old, younger than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 111,500 vehicles a day, roughly 5% of them trucks, projected to reach 138,260 by 2040. The structure is 476 ft (145.1 m) long and 39 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesNB I-25 Ramp
CrossesI225 Ml
LocationAt I-25/I-225
RouteInterstate 25A
Coordinates39.63054, -104.90507
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating59.6 US tons
Inventory rating44.3 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, precast panels
Main spans3
Design loadHS 25 or greater
Structure length476 ft (145.1 m)
Longest span165 ft (50.3 m)
Deck width39 ft (11.9 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic111,500 (2020)
Projected traffic138,260 by 2040
Trucks5%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was NB I-25 Ramp over I225 Ml built?

It was built in 2005, making it 20 years old in 2025.

What condition is NB I-25 Ramp over I225 Ml in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does NB I-25 Ramp over I225 Ml carry?

About 111,500 vehicles per day (2020 count), of which roughly 5% are trucks.

How long is NB I-25 Ramp over I225 Ml?

The structure is 476 ft (145.1 m) long with a longest span of 165 ft (50.3 m) and a deck 39 ft wide.

Who owns NB I-25 Ramp over I225 Ml?

It is owned by the State Highway Agency.