US 285 Ml over SH 95 Ml
GoodDenver County, Colorado · Hampden/Sheridan · Structure no. F-16-RT
- Built
- 1993
- 32 years old
- Condition
- Good
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 193 ft
- 2 main spans
- Daily traffic
- 55,000
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
US 285 Ml over SH 95 Ml is a prestressed concrete continuous stringer/multi-beam or girder carrying US 285 Ml over SH 95 Ml in Denver County, Colorado. It was built in 1993, so it is 32 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 55,000 vehicles a day, roughly 2% of them trucks, projected to reach 62,700 by 2040. The structure is 193 ft (58.7 m) long and 126 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US 285 Ml over SH 95 Ml built?
It was built in 1993, making it 32 years old in 2025.
What condition is US 285 Ml over SH 95 Ml in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.
How much traffic does US 285 Ml over SH 95 Ml carry?
About 55,000 vehicles per day (2020 count), of which roughly 2% are trucks.
How long is US 285 Ml over SH 95 Ml?
The structure is 193 ft (58.7 m) long with a longest span of 95 ft (29.1 m) and a deck 126 ft wide.
Who owns US 285 Ml over SH 95 Ml?
It is owned by the State Highway Agency.