US Bridges

York Street over Greenway Channel

Good

Denver County, Colorado · York ST / Grnway Channel · Structure no. D-33-GW-100

Built
2020
5 years old
Condition
Good
inspected January 2025
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
56 ft
1 main span
Daily traffic
16,808
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

York Street over Greenway Channel is a prestressed concrete box beam or girders - multiple carrying York Street over Greenway Channel in Denver County, Colorado. It was built in 2020, so it is 5 years old, younger than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 16,808 vehicles a day, roughly 6% of them trucks, projected to reach 18,657 by 2041. The structure is 56 ft (17.1 m) long and 68 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesYork Street
CrossesGreenway Channel
LocationYork ST / Grnway Channel
RouteCity Street 0
Coordinates39.77128, -104.95963
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating40.7 US tons
Inventory rating31.4 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length56 ft (17.1 m)
Longest span50 ft (15.2 m)
Deck width68 ft (20.7 m)
Roadway width48 ft (14.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic16,808 (2021)
Projected traffic18,657 by 2041
Trucks6%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was York Street over Greenway Channel built?

It was built in 2020, making it 5 years old in 2025.

What condition is York Street over Greenway Channel in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.

How much traffic does York Street over Greenway Channel carry?

About 16,808 vehicles per day (2021 count), of which roughly 6% are trucks.

How long is York Street over Greenway Channel?

The structure is 56 ft (17.1 m) long with a longest span of 50 ft (15.2 m) and a deck 68 ft wide.

Who owns York Street over Greenway Channel?

It is owned by the City or Municipal Highway Agency.