US Bridges

EB High Point Boul over Second Creek Tributary

Good

Denver County, Colorado · 0.3 MI E of Tower RD · Structure no. D-32-SCND-031

Built
2020
5 years old
Condition
Good
inspected January 2025
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
65 ft
1 main span
Daily traffic
1
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

EB High Point Boul over Second Creek Tributary is a prestressed concrete stringer/multi-beam or girder carrying EB High Point Boul over Second Creek Tributary in Denver County, Colorado. It was built in 2020, so it is 5 years old, younger than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1 vehicles a day, projected to reach 1 by 2041. The structure is 65 ft (19.8 m) long and 38 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesEB High Point Boul
CrossesSecond Creek Tributary
Location0.3 MI E of Tower RD
RouteCity Street 0
Coordinates39.81942, -104.76648
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating69.3 US tons
Inventory rating39.2 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length65 ft (19.8 m)
Longest span59 ft (18 m)
Deck width38 ft (11.6 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1 (2021)
Projected traffic1 by 2041
Trucks0%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was EB High Point Boul over Second Creek Tributary built?

It was built in 2020, making it 5 years old in 2025.

What condition is EB High Point Boul over Second Creek Tributary in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.

How much traffic does EB High Point Boul over Second Creek Tributary carry?

About 1 vehicles per day (2021 count).

How long is EB High Point Boul over Second Creek Tributary?

The structure is 65 ft (19.8 m) long with a longest span of 59 ft (18 m) and a deck 38 ft wide.

Who owns EB High Point Boul over Second Creek Tributary?

It is owned by the City or Municipal Highway Agency.