US Bridges

Level 6 SW Termina over 84th Avenue

Good

Denver County, Colorado · SW Corner Term Bldg · Structure no. D-31-PB-822A

Built
2014
11 years old
Condition
Good
inspected January 2025
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
439 ft
5 main spans
Daily traffic
8,129
2021 count
Owner
Local
Other Local Agency

About this bridge

Level 6 SW Termina over 84th Avenue is a prestressed concrete continuous stringer/multi-beam or girder carrying Level 6 SW Termina over 84th Avenue in Denver County, Colorado. It was built in 2014, so it is 11 years old, younger than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 8,129 vehicles a day, roughly 2% of them trucks, projected to reach 9,023 by 2041. The structure is 439 ft (133.7 m) long and 39 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesLevel 6 SW Termina
Crosses84th Avenue
LocationSW Corner Term Bldg
RouteCity Street 0
Coordinates39.84698, -104.67493
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating62.2 US tons
Inventory rating35.6 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans5 (+1 approach)
Design loadHS 20
Structure length439 ft (133.7 m)
Longest span115 ft (35.2 m)
Deck width39 ft (12 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic8,129 (2021)
Projected traffic9,023 by 2041
Trucks2%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerOther Local Agency
Maintained byOther Local Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Level 6 SW Termina over 84th Avenue built?

It was built in 2014, making it 11 years old in 2025.

What condition is Level 6 SW Termina over 84th Avenue in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.

How much traffic does Level 6 SW Termina over 84th Avenue carry?

About 8,129 vehicles per day (2021 count), of which roughly 2% are trucks.

How long is Level 6 SW Termina over 84th Avenue?

The structure is 439 ft (133.7 m) long with a longest span of 115 ft (35.2 m) and a deck 39 ft wide.

Who owns Level 6 SW Termina over 84th Avenue?

It is owned by the Other Local Agency.