US Bridges

EB Pena Boulevard over Future Picadilly Road |

Fair

Denver County, Colorado · 0.4 MI East of E-470 · Structure no. D-31-PB-420

Built
1992
33 years old
Condition
Fair
inspected January 2025
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
188 ft
1 main span
Daily traffic
69,239
2021 count
Owner
Local
Other Local Agency

About this bridge

EB Pena Boulevard over Future Picadilly Road | is a prestressed concrete box beam or girders - multiple carrying EB Pena Boulevard over Future Picadilly Road | in Denver County, Colorado. It was built in 1992, so it is 33 years old, younger than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 69,239 vehicles a day, roughly 6% of them trucks, projected to reach 76,855 by 2041. The structure is 188 ft (57.2 m) long and 75 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesEB Pena Boulevard
CrossesFuture Picadilly Road |
Location0.4 MI East of E-470
RouteCity Street 0
Coordinates39.83375, -104.73476
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating64.4 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length188 ft (57.2 m)
Longest span182 ft (55.6 m)
Deck width75 ft (22.9 m)
Roadway width73 ft (22.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic69,239 (2021)
Projected traffic76,855 by 2041
Trucks6%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesOther
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerOther Local Agency
Maintained byOther Local Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was EB Pena Boulevard over Future Picadilly Road | built?

It was built in 1992, making it 33 years old in 2025.

What condition is EB Pena Boulevard over Future Picadilly Road | in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.

How much traffic does EB Pena Boulevard over Future Picadilly Road | carry?

About 69,239 vehicles per day (2021 count), of which roughly 6% are trucks.

How long is EB Pena Boulevard over Future Picadilly Road |?

The structure is 188 ft (57.2 m) long with a longest span of 182 ft (55.6 m) and a deck 75 ft wide.

Who owns EB Pena Boulevard over Future Picadilly Road |?

It is owned by the Other Local Agency.