S Monaco Street Pa over Goldsmith Gulch | E Jewe
FairDenver County, Colorado · At Colo DR & Jewell Ave · Structure no. D-11-GG-050A
- Built
- 1965
- 60 years old, rebuilt 1995
- Condition
- Fair
- inspected December 2024
- Type
- Culvert
- Concrete
- Length
- 45 ft
- 3 main spans
- Daily traffic
- 15,005
- 2021 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
S Monaco Street Pa over Goldsmith Gulch | E Jewe is a concrete culvert carrying S Monaco Street Pa over Goldsmith Gulch | E Jewe in Denver County, Colorado. It was built in 1965 and reconstructed in 1995, so it is 60 years old, older than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 15,005 vehicles a day, roughly 5% of them trucks, projected to reach 16,656 by 2041. The structure is 45 ft (13.6 m) long and 127 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 8 Very Good | No problems noted. |
| Culvert | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was S Monaco Street Pa over Goldsmith Gulch | E Jewe built?
It was built in 1965, making it 60 years old in 2025. It was reconstructed in 1995.
What condition is S Monaco Street Pa over Goldsmith Gulch | E Jewe in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.
How much traffic does S Monaco Street Pa over Goldsmith Gulch | E Jewe carry?
About 15,005 vehicles per day (2021 count), of which roughly 5% are trucks.
How long is S Monaco Street Pa over Goldsmith Gulch | E Jewe?
The structure is 45 ft (13.6 m) long with a longest span of 14 ft (4.3 m) and a deck 127 ft wide.
Who owns S Monaco Street Pa over Goldsmith Gulch | E Jewe?
It is owned by the City or Municipal Highway Agency.