US Bridges

Broadway over Cherry Creek

Fair

Denver County, Colorado · Broadway at Speer Blvd · Structure no. D-01-CC-180A

Built
1988
37 years old
Condition
Fair
inspected October 2024
Type
Box Beam or Girders - Single or Spread
Steel
Length
145 ft
1 main span
Daily traffic
30,573
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

Broadway over Cherry Creek is a steel box beam or girders - single or spread carrying Broadway over Cherry Creek in Denver County, Colorado. It was built in 1988, so it is 37 years old, younger than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 30,573 vehicles a day, roughly 5% of them trucks, projected to reach 33,936 by 2041. The structure is 145 ft (44.1 m) long and 123 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesBroadway
CrossesCherry Creek
LocationBroadway at Speer Blvd
RouteCity Street 0
Coordinates39.72664, -104.98725
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating40 US tons
Inventory rating36 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length145 ft (44.1 m)
Longest span134 ft (40.8 m)
Deck width123 ft (37.5 m)
Roadway width74 ft (22.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic30,573 (2021)
Projected traffic33,936 by 2041
Trucks5%
Lanes on structure5
Traffic directionOne-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Broadway over Cherry Creek built?

It was built in 1988, making it 37 years old in 2025.

What condition is Broadway over Cherry Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.

How much traffic does Broadway over Cherry Creek carry?

About 30,573 vehicles per day (2021 count), of which roughly 5% are trucks.

How long is Broadway over Cherry Creek?

The structure is 145 ft (44.1 m) long with a longest span of 134 ft (40.8 m) and a deck 123 ft wide.

Who owns Broadway over Cherry Creek?

It is owned by the City or Municipal Highway Agency.