CR/N75 Noel RD over Surface Creek
FairDelta County, Colorado · .1 MI W of SH 65 · Structure no. ORCHARD CITY-2A
- Built
- 1988
- 37 years old
- Condition
- Fair
- inspected September 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 27 ft
- 1 main span
- Daily traffic
- 167
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
CR/N75 Noel RD over Surface Creek is a steel stringer/multi-beam or girder carrying CR/N75 Noel RD over Surface Creek in Delta County, Colorado. It was built in 1988, so it is 37 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 167 vehicles a day, roughly 2% of them trucks, projected to reach 189 by 2042. The structure is 27 ft (8.3 m) long and 24 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR/N75 Noel RD over Surface Creek built?
It was built in 1988, making it 37 years old in 2025.
What condition is CR/N75 Noel RD over Surface Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does CR/N75 Noel RD over Surface Creek carry?
About 167 vehicles per day (2022 count), of which roughly 2% are trucks.
How long is CR/N75 Noel RD over Surface Creek?
The structure is 27 ft (8.3 m) long with a longest span of 25 ft (7.5 m) and a deck 24 ft wide.
Who owns CR/N75 Noel RD over Surface Creek?
It is owned by the City or Municipal Highway Agency.