SH 133 Frontage RD over Fire Mountain Canal
FairDelta County, Colorado · Orig 133 near Bowie · Structure no. I-06-U
- Built
- 1970
- 55 years old
- Condition
- Fair
- inspected January 2025
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 34 ft
- 1 main span
- Daily traffic
- 10
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
SH 133 Frontage RD over Fire Mountain Canal is a steel stringer/multi-beam or girder carrying SH 133 Frontage RD over Fire Mountain Canal in Delta County, Colorado. It was built in 1970, so it is 55 years old, older than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 10 vehicles a day, roughly 16% of them trucks, projected to reach 17 by 2040. The structure is 34 ft (10.3 m) long and 24 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SH 133 Frontage RD over Fire Mountain Canal built?
It was built in 1970, making it 55 years old in 2025.
What condition is SH 133 Frontage RD over Fire Mountain Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.
How much traffic does SH 133 Frontage RD over Fire Mountain Canal carry?
About 10 vehicles per day (2020 count), of which roughly 16% are trucks.
How long is SH 133 Frontage RD over Fire Mountain Canal?
The structure is 34 ft (10.3 m) long with a longest span of 32 ft (9.8 m) and a deck 24 ft wide.
Who owns SH 133 Frontage RD over Fire Mountain Canal?
It is owned by the State Highway Agency.