County Road 4065 over Fire Mountain Canal
GoodDelta County, Colorado · .6 MI N of SH 133 · Structure no. DEL4010D16.1-65
- Built
- 1981
- 44 years old
- Condition
- Good
- inspected September 2023
- Type
- Tee Beam
- Concrete
- Length
- 36 ft
- 1 main span
- Daily traffic
- 248
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
County Road 4065 over Fire Mountain Canal is a concrete tee beam carrying County Road 4065 over Fire Mountain Canal in Delta County, Colorado. It was built in 1981, so it is 44 years old, older than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 248 vehicles a day, roughly 2% of them trucks, projected to reach 280 by 2042. The structure is 36 ft (11 m) long and 30 ft wide. If it were closed, the detour would be 98.8 mi (159 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Road 4065 over Fire Mountain Canal built?
It was built in 1981, making it 44 years old in 2025.
What condition is County Road 4065 over Fire Mountain Canal in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.
How much traffic does County Road 4065 over Fire Mountain Canal carry?
About 248 vehicles per day (2022 count), of which roughly 2% are trucks.
How long is County Road 4065 over Fire Mountain Canal?
The structure is 36 ft (11 m) long with a longest span of 33 ft (10.1 m) and a deck 30 ft wide.
Who owns County Road 4065 over Fire Mountain Canal?
It is owned by the County Highway Agency.