US Bridges

Forest Road 240 over Hot Creek

Good

Conejos County, Colorado · 0.5 MI S of CR 255 · Structure no. CON07.5W-13.4NA

Built
2011
14 years old
Condition
Good
inspected March 2025
Type
Culvert
Steel
Length
22 ft
2 main spans
Daily traffic
55
2022 count
Owner
County
County Highway Agency

About this bridge

Forest Road 240 over Hot Creek is a steel culvert carrying Forest Road 240 over Hot Creek in Conejos County, Colorado. It was built in 2011, so it is 14 years old, younger than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 55 vehicles a day, roughly 4% of them trucks, projected to reach 63 by 2042. The structure is 22 ft (6.8 m) long and 30 ft wide. If it were closed, the detour would be 98.8 mi (159 km).

CarriesForest Road 240
CrossesHot Creek
Location0.5 MI S of CR 255
RouteCounty Highway 0
Coordinates37.27599, -106.15707
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionMarch 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating103.6 US tons
Inventory rating0 US tons

Structure

Structure typeCulvert
MaterialSteel
DeckNot applicable
Main spans2
Design loadHS 20
Structure length22 ft (6.8 m)
Longest span10 ft (2.9 m)
Deck width30 ft (9 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic55 (2022)
Projected traffic63 by 2042
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Forest Road 240 over Hot Creek built?

It was built in 2011, making it 14 years old in 2025.

What condition is Forest Road 240 over Hot Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2025.

How much traffic does Forest Road 240 over Hot Creek carry?

About 55 vehicles per day (2022 count), of which roughly 4% are trucks.

How long is Forest Road 240 over Hot Creek?

The structure is 22 ft (6.8 m) long with a longest span of 10 ft (2.9 m) and a deck 30 ft wide.

Who owns Forest Road 240 over Hot Creek?

It is owned by the County Highway Agency.