I 70 Frontage RD over Clear Creek SR
FairClear Creek County, Colorado · 0.1 MI W. of Silverplume · Structure no. F-14-M
- Built
- 1938
- 87 years old
- Condition
- Fair
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 54 ft
- 1 main span
- Daily traffic
- 18,815
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
I 70 Frontage RD over Clear Creek SR is a steel stringer/multi-beam or girder carrying I 70 Frontage RD over Clear Creek SR in Clear Creek County, Colorado. It was built in 1938, so it is 87 years old, older than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 18,815 vehicles a day, roughly 9% of them trucks, projected to reach 23,518 by 2044. The structure is 54 ft (16.6 m) long and 31 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I 70 Frontage RD over Clear Creek SR built?
It was built in 1938, making it 87 years old in 2025.
What condition is I 70 Frontage RD over Clear Creek SR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does I 70 Frontage RD over Clear Creek SR carry?
About 18,815 vehicles per day (2024 count), of which roughly 9% are trucks.
How long is I 70 Frontage RD over Clear Creek SR?
The structure is 54 ft (16.6 m) long with a longest span of 50 ft (15.2 m) and a deck 31 ft wide.
Who owns I 70 Frontage RD over Clear Creek SR?
It is owned by the State Highway Agency.