I 70 Frontage over W Fork Clear Creek SR
GoodClear Creek County, Colorado · 3.5 MI NE of Georgetown · Structure no. E-14-BH
- Built
- 2000
- 25 years old
- Condition
- Good
- inspected April 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 80 ft
- 1 main span
- Daily traffic
- 668
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
I 70 Frontage over W Fork Clear Creek SR is a prestressed concrete box beam or girders - multiple carrying I 70 Frontage over W Fork Clear Creek SR in Clear Creek County, Colorado. It was built in 2000, so it is 25 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 668 vehicles a day, roughly 5% of them trucks, projected to reach 835 by 2044. The structure is 80 ft (24.3 m) long and 35 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I 70 Frontage over W Fork Clear Creek SR built?
It was built in 2000, making it 25 years old in 2025.
What condition is I 70 Frontage over W Fork Clear Creek SR in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.
How much traffic does I 70 Frontage over W Fork Clear Creek SR carry?
About 668 vehicles per day (2024 count), of which roughly 5% are trucks.
How long is I 70 Frontage over W Fork Clear Creek SR?
The structure is 80 ft (24.3 m) long with a longest span of 76 ft (23.2 m) and a deck 35 ft wide.
Who owns I 70 Frontage over W Fork Clear Creek SR?
It is owned by the State Highway Agency.