Central City Parkw over Clear Creek
FairClear Creek County, Colorado · 0.5 Mi. W of I-70 · Structure no. CC-PRKWAY-MM0.5
- Built
- 2004
- 21 years old
- Condition
- Fair
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 372 ft
- 3 main spans
- Daily traffic
- 2,621
- 2021 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Central City Parkw over Clear Creek is a prestressed concrete continuous stringer/multi-beam or girder carrying Central City Parkw over Clear Creek in Clear Creek County, Colorado. It was built in 2004, so it is 21 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 2,621 vehicles a day, projected to reach 3,145 by 2041. The structure is 372 ft (113.5 m) long and 55 ft wide. If it were closed, the detour would be 8.1 mi (13 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Central City Parkw over Clear Creek built?
It was built in 2004, making it 21 years old in 2025.
What condition is Central City Parkw over Clear Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does Central City Parkw over Clear Creek carry?
About 2,621 vehicles per day (2021 count).
How long is Central City Parkw over Clear Creek?
The structure is 372 ft (113.5 m) long with a longest span of 145 ft (44.2 m) and a deck 55 ft wide.
Who owns Central City Parkw over Clear Creek?
It is owned by the City or Municipal Highway Agency.