US Bridges

Nwp EB over WB Dillon Road

Fair

Broomfield County, Colorado · 5.59 MI from I-25 · Structure no. NWP-05.59A

Built
2002
23 years old
Condition
Fair
inspected June 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
127 ft
1 main span
Daily traffic
2,500
2018 count
Owner
Toll Authority
Local Toll Authority

About this bridge

Nwp EB over WB Dillon Road is a prestressed concrete stringer/multi-beam or girder carrying Nwp EB over WB Dillon Road in Broomfield County, Colorado. It was built in 2002, so it is 23 years old, younger than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 2,500 vehicles a day, roughly 10% of them trucks, projected to reach 20,000 by 2038. The structure is 127 ft (38.7 m) long and 43 ft wide.

CarriesNwp EB
CrossesWB Dillon Road
Location5.59 MI from I-25
Coordinates39.95933, -105.0834
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating82.1 US tons
Inventory rating47.2 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 25 or greater
Structure length127 ft (38.7 m)
Longest span122 ft (37.1 m)
Deck width43 ft (13.2 m)
Roadway width40 ft (12.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,500 (2018)
Projected traffic20,000 by 2038
Trucks10%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerLocal Toll Authority
Maintained byLocal Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Nwp EB over WB Dillon Road built?

It was built in 2002, making it 23 years old in 2025.

What condition is Nwp EB over WB Dillon Road in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.

How much traffic does Nwp EB over WB Dillon Road carry?

About 2,500 vehicles per day (2018 count), of which roughly 10% are trucks.

How long is Nwp EB over WB Dillon Road?

The structure is 127 ft (38.7 m) long with a longest span of 122 ft (37.1 m) and a deck 43 ft wide.

Who owns Nwp EB over WB Dillon Road?

It is owned by the Local Toll Authority.