County Line Road over Spring Gulch #2
GoodBoulder County, Colorado · 0.20 MI N. of E 9th Ave · Structure no. LONG-CLR-E9TH
- Built
- 2021
- 4 years old
- Condition
- Good
- inspected January 2025
- Type
- Culvert
- Concrete
- Length
- 33 ft
- 2 main spans
- Daily traffic
- 15,509
- 2023 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
County Line Road over Spring Gulch #2 is a concrete culvert carrying County Line Road over Spring Gulch #2 in Boulder County, Colorado. It was built in 2021, so it is 4 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 15,509 vehicles a day, roughly 9% of them trucks, projected to reach 18,611 by 2042. The structure is 33 ft (10.1 m) long and 93 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 8 Very Good | No problems noted. |
| Culvert | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Line Road over Spring Gulch #2 built?
It was built in 2021, making it 4 years old in 2025.
What condition is County Line Road over Spring Gulch #2 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.
How much traffic does County Line Road over Spring Gulch #2 carry?
About 15,509 vehicles per day (2023 count), of which roughly 9% are trucks.
How long is County Line Road over Spring Gulch #2?
The structure is 33 ft (10.1 m) long with a longest span of 13 ft (4 m) and a deck 93 ft wide.
Who owns County Line Road over Spring Gulch #2?
It is owned by the City or Municipal Highway Agency.