US Bridges

Horizon Avenue over Rock Creek

Fair

Boulder County, Colorado · .1 MI East 120th · Structure no. LAF-HORIZ-004

Built
2000
25 years old
Condition
Fair
inspected January 2025
Type
Culvert
Concrete
Length
76 ft
4 main spans
Daily traffic
1,043
2023 count
Owner
City
City or Municipal Highway Agency

About this bridge

Horizon Avenue over Rock Creek is a concrete culvert carrying Horizon Avenue over Rock Creek in Boulder County, Colorado. It was built in 2000, so it is 25 years old, younger than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,043 vehicles a day, roughly 11% of them trucks, projected to reach 1,251 by 2043. The structure is 76 ft (23.2 m) long and 48 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesHorizon Avenue
CrossesRock Creek
Location.1 MI East 120th
RouteCity Street 0
Coordinates39.98022, -105.07028
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating71.4 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans4
Design loadHS 20
Structure length76 ft (23.2 m)
Longest span20 ft (6.1 m)
Deck width48 ft (14.6 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,043 (2023)
Projected traffic1,251 by 2043
Trucks11%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Horizon Avenue over Rock Creek built?

It was built in 2000, making it 25 years old in 2025.

What condition is Horizon Avenue over Rock Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.

How much traffic does Horizon Avenue over Rock Creek carry?

About 1,043 vehicles per day (2023 count), of which roughly 11% are trucks.

How long is Horizon Avenue over Rock Creek?

The structure is 76 ft (23.2 m) long with a longest span of 20 ft (6.1 m) and a deck 48 ft wide.

Who owns Horizon Avenue over Rock Creek?

It is owned by the City or Municipal Highway Agency.