US Bridges

Folsom Street over Boulder Creek

Fair

Boulder County, Colorado · 0.40 MI S of Canyon Blvd · Structure no. BOLD-04-0.40-01

Built
1965
60 years old
Condition
Fair
inspected February 2025
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
60 ft
1 main span
Daily traffic
8,407
2023 count
Owner
City
City or Municipal Highway Agency

About this bridge

Folsom Street over Boulder Creek is a prestressed concrete stringer/multi-beam or girder carrying Folsom Street over Boulder Creek in Boulder County, Colorado. It was built in 1965, so it is 60 years old, older than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 8,407 vehicles a day, roughly 4% of them trucks, projected to reach 10,088 by 2043. The structure is 60 ft (18.3 m) long and 56 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesFolsom Street
CrossesBoulder Creek
Location0.40 MI S of Canyon Blvd
RouteCity Street 0
Coordinates40.01134, -105.26325
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionFebruary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating81.5 US tons
Inventory rating38.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length60 ft (18.3 m)
Longest span57 ft (17.4 m)
Deck width56 ft (17.1 m)
Roadway width44 ft (13.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic8,407 (2023)
Projected traffic10,088 by 2043
Trucks4%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Folsom Street over Boulder Creek built?

It was built in 1965, making it 60 years old in 2025.

What condition is Folsom Street over Boulder Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2025.

How much traffic does Folsom Street over Boulder Creek carry?

About 8,407 vehicles per day (2023 count), of which roughly 4% are trucks.

How long is Folsom Street over Boulder Creek?

The structure is 60 ft (18.3 m) long with a longest span of 57 ft (17.4 m) and a deck 56 ft wide.

Who owns Folsom Street over Boulder Creek?

It is owned by the City or Municipal Highway Agency.