Boulder Creek Path over Boulder Creek
FairPosted for loadBoulder County, Colorado · 4MI Canyon Path at SH119 · Structure no. BCPOS-FOURMILE
- Built
- 2020
- 5 years old
- Condition
- Fair
- inspected January 2025
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 45 ft
- 1 main span
- Daily traffic
- 11
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
Boulder Creek Path over Boulder Creek is a steel stringer/multi-beam or girder carrying Boulder Creek Path over Boulder Creek in Boulder County, Colorado. It was built in 2020, so it is 5 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 11 vehicles a day, projected to reach 13 by 2042. The structure is 45 ft (13.7 m) long and 24 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Boulder Creek Path over Boulder Creek built?
It was built in 2020, making it 5 years old in 2025.
What condition is Boulder Creek Path over Boulder Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.
How much traffic does Boulder Creek Path over Boulder Creek carry?
About 11 vehicles per day (2023 count).
How long is Boulder Creek Path over Boulder Creek?
The structure is 45 ft (13.7 m) long with a longest span of 44 ft (13.3 m) and a deck 24 ft wide.
Who owns Boulder Creek Path over Boulder Creek?
It is owned by the County Highway Agency.