Baseline Road (cr over South Boulder Creek
FairBoulder County, Colorado · 0.1 MI W of Cherryvale RD · Structure no. BC-56-0.5-SB
- Built
- 1980
- 45 years old
- Condition
- Fair
- inspected February 2025
- Type
- Tee Beam
- Prestressed Concrete
- Length
- 43 ft
- 1 main span
- Daily traffic
- 4,986
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
Baseline Road (cr over South Boulder Creek is a prestressed concrete tee beam carrying Baseline Road (cr over South Boulder Creek in Boulder County, Colorado. It was built in 1980, so it is 45 years old, older than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 4,986 vehicles a day, roughly 3% of them trucks, projected to reach 5,983 by 2042. The structure is 43 ft (13.2 m) long and 39 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Baseline Road (cr over South Boulder Creek built?
It was built in 1980, making it 45 years old in 2025.
What condition is Baseline Road (cr over South Boulder Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2025.
How much traffic does Baseline Road (cr over South Boulder Creek carry?
About 4,986 vehicles per day (2022 count), of which roughly 3% are trucks.
How long is Baseline Road (cr over South Boulder Creek?
The structure is 43 ft (13.2 m) long with a longest span of 38 ft (11.6 m) and a deck 39 ft wide.
Who owns Baseline Road (cr over South Boulder Creek?
It is owned by the County Highway Agency.