CO RD 3 / 119th S over Dry Creek No 2
GoodBoulder County, Colorado · 0.9 MI S of SH119 · Structure no. BC-3-8.1-DR2
- Built
- 2013
- 12 years old
- Condition
- Good
- inspected February 2025
- Type
- Slab
- Prestressed Concrete
- Length
- 44 ft
- 1 main span
- Daily traffic
- 2,541
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
CO RD 3 / 119th S over Dry Creek No 2 is a prestressed concrete slab carrying CO RD 3 / 119th S over Dry Creek No 2 in Boulder County, Colorado. It was built in 2013, so it is 12 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,541 vehicles a day, roughly 13% of them trucks, projected to reach 3,049 by 2043. The structure is 44 ft (13.4 m) long and 36 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CO RD 3 / 119th S over Dry Creek No 2 built?
It was built in 2013, making it 12 years old in 2025.
What condition is CO RD 3 / 119th S over Dry Creek No 2 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2025.
How much traffic does CO RD 3 / 119th S over Dry Creek No 2 carry?
About 2,541 vehicles per day (2023 count), of which roughly 13% are trucks.
How long is CO RD 3 / 119th S over Dry Creek No 2?
The structure is 44 ft (13.4 m) long with a longest span of 40 ft (12.2 m) and a deck 36 ft wide.
Who owns CO RD 3 / 119th S over Dry Creek No 2?
It is owned by the County Highway Agency.