Prospect Road CR24 over Boulder Feeder Ditch
FairBoulder County, Colorado · 0.3 MI E of CO RD 57 · Structure no. BC-24-0.3-ID1
- Built
- 1988
- 37 years old
- Condition
- Fair
- inspected February 2025
- Type
- Frame
- Concrete
- Length
- 32 ft
- 1 main span
- Daily traffic
- 180
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
Prospect Road CR24 over Boulder Feeder Ditch is a concrete frame carrying Prospect Road CR24 over Boulder Feeder Ditch in Boulder County, Colorado. It was built in 1988, so it is 37 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 180 vehicles a day, roughly 15% of them trucks, projected to reach 216 by 2043. The structure is 32 ft (9.7 m) long and 30 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Prospect Road CR24 over Boulder Feeder Ditch built?
It was built in 1988, making it 37 years old in 2025.
What condition is Prospect Road CR24 over Boulder Feeder Ditch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2025.
How much traffic does Prospect Road CR24 over Boulder Feeder Ditch carry?
About 180 vehicles per day (2023 count), of which roughly 15% are trucks.
How long is Prospect Road CR24 over Boulder Feeder Ditch?
The structure is 32 ft (9.7 m) long with a longest span of 28 ft (8.6 m) and a deck 30 ft wide.
Who owns Prospect Road CR24 over Boulder Feeder Ditch?
It is owned by the County Highway Agency.