N. 95th ST (CR19) over Left Hand Creek
GoodBoulder County, Colorado · 0.4 MI S of SH 119 · Structure no. BC-19-9.0-LT-A
- Built
- 2009
- 16 years old
- Condition
- Good
- inspected February 2025
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 103 ft
- 1 main span
- Daily traffic
- 11,067
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
N. 95th ST (CR19) over Left Hand Creek is a prestressed concrete box beam or girders - multiple carrying N. 95th ST (CR19) over Left Hand Creek in Boulder County, Colorado. It was built in 2009, so it is 16 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 11,067 vehicles a day, roughly 4% of them trucks, projected to reach 13,280 by 2043. The structure is 103 ft (31.3 m) long and 58 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was N. 95th ST (CR19) over Left Hand Creek built?
It was built in 2009, making it 16 years old in 2025.
What condition is N. 95th ST (CR19) over Left Hand Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2025.
How much traffic does N. 95th ST (CR19) over Left Hand Creek carry?
About 11,067 vehicles per day (2023 count), of which roughly 4% are trucks.
How long is N. 95th ST (CR19) over Left Hand Creek?
The structure is 103 ft (31.3 m) long with a longest span of 97 ft (29.6 m) and a deck 58 ft wide.
Who owns N. 95th ST (CR19) over Left Hand Creek?
It is owned by the County Highway Agency.